Home > Products
Tools and Installation
Tools and Installation

Tools

and

Installation Instructions


Tools and Installation 下载

  • 产品介绍
 

Tools and Installation  Instructions

 

 

Tools

 

Coning Tools

Apply in high pressure tube for concentric cone

processing. All the coning tool use the same basic

tool on which the blades and the collets of different

sizes can be replaced. A complete ordering number

shall include basic tool collet and blade. the collet and

the blade can be ordered separately.

For detailed information please refer to the instruction

manual or consult corporation.

 

 

 

Threading Tools

Apply in high pressure tube for thread processing. All the

manual threading tool use the same basic tool on which

the threading dies and the guide of different sizes

can be replaced. A complete ordering number shall include

basic tool, threading die and guide . The threading

die and the guide can be ordered separately.

For detailed information please refer to the instruction

manual or consult corporation.


 

Reseating Tools

The tool is used for repairing the wearing cone seat of high pressure

fitting or valve. A complete ordering number shall include cutter,

antifriction gasket, orientation nut and handle. Cutter, antifriction

gasket, orientation nut and handle can be ordered separately.

For detailed information please refer to the instruction manual

or consult FITOK Group corporation.

 

 

 

 

Installation Instructions

 

Assembly of Coning and Threading

Connections

1. Processed the tube end into the structure as shown on the

right, for dimensions please see the table below.

 

 


 

2. First, insert the tube through the gland, then screw in the collar until the conical end of the tube showing 1-2 threads.

 

3. If permitted, coating the cone tip with a small quantity of lubricant which is compatible with the system media.

 

 

4. Insert the tubing into the connecting port and finger tighten the gland.

 

5. Using a torque wrench to tighten the gland with the torque ratings shown in the table below while holding fitting body or valve body steady.

 

 

Assembly of Anti-Vibration Gland Connections

1. The assembly of 20 series Anti-Vibration gland is the same as that of coning and threading connections, but plus

one more step as follow:

For initial assembling, finger tighten the collet gland and holding the gland body steady, tighten the collet gland

1-1/4 turns with a wrench. For reassembling, tighten the collet gland with a wrench from finger tight to 3/4 turn.

 

2. The assembly of 60 series Anti-Vibration gland is the same as that of coning and threading connections except

different torque ratings. Please using a torque wrench to tighten the gland with the torque ratings shown in the

table below while holding fitting body or valve body steady.

 

Note:

When installing, please follow the given method and torque rating , otherwise it will affect the performance of the product.

 

 

联系我们
电话:0755-27241131
传真:0755-27241131
邮箱:info@unionc.cn
地址:深圳市龙华新区龙华办事处三联社区弓村二区41栋
留言
姓名
电话
邮箱
内容
 

扫码关注我们

 

粤ICP备15040231号-1 © 深圳市尤里科工业技术有限公司 2006-2017